Kohuora Park Bridge and Boardwalk
Location: Papatoetoe
Dates: April 2005 - March 2006
Details:
- Cleared existing vegetation
- 174m long boardwalk constructed on driven piles
- Driven piles left ‘proud’
- 2m wide boardwalk was constructed with a viewing platform
- The bridge was constructed on three 8m pre-tensioned glulam beams with handrails
- A 64m concrete footpath was constructed to link the structure and footpath network
Value: $149,000
Client: Manuaku City Council

|
|
 |
|
|
| |
HEB Construction - civil contracting, roading and bridge construction, subdivisions, landscaping, infrastructure maintenance, drainage, precast and prestressed concrete, wharves and marinas, piling and foundations |
|
|
|