HEB ConstructionHEB Construction people and machinery

Bridges & Structures

HEB Structures centres their operations at Mt Maunganui where there are extensive facilities to support the nationwide business.


We pride ourselves on being able to carry out most aspects of heavy civil engineering contracts in-house. Apart from our precast concrete operation, we have a large workshop which services the heavy haulage fleet and a fabrication shop.


We design and build our own steel formwork, falsework systems and  steelwork production required for bridge building and associated heavy civils. This includes specialist transport systems for beam and girder launching.


HEB Structures have all the plant, labour, designers and experience required to build many types of structures. These include I beam bridges such as Mokau, Turangaarere and Hihitahi and T Roff beam bridges such as Puhinui, Otara Creek and Hewletts Road flyover. We also manufacture our own hollowcore units for bridges, recent examples being Highbrook, Hihitahi, Huntly and Katetoke, as well as farm bridges that can be very economical solution for larger spans.


Larger special beams are also made to particular designs. One recent and outstanding example is the L-shaped beams for the Rapahoe rail bridge in Greymouth. A common feature of all these bridge beams is the ability to carry out all the pre-stressing and post-tensioning in-house using our own expertise and jacking systems.


Additionally we have travelling formwork systems for balanced cantilever bridges such as the award-winning Otira Viaduct on the Alpine Highway and systems for glued segmental bridges that were a feature of Route PJK in Tauranga.


Whilst all of the examples mentioned above are road or rail bridges we use our equipment and know-how to accomplish a huge range of jobs that are not always infrastructure related. When Gulf Oil required a new storage depot at Mt Maunganui HEB Structures were employed to successfully manage the relocation of the tanks from Marsden Point.

 

We have also been involved with many port developments from Shakespeare Bay logging terminal for the Ports of Marlborough to sheet piling for the Ports of Tauranga. We were also partners in the Waikato pipeline contract, bringing water from the Waikato River to Auckland. In this instance we were responsible for the river intake works and balancing reservoirs en-route. Another aspect of our work has been the construction of off-shore outfalls such as Green Island in Dunedin where we built a walking platform for the construction through the surf zone and for trenching off-shore.


For piling, foundations, water and wastewater and marinas please see other relevant sections of this site.


  SH25 Kopu Bridge Replacement - 580m long, two-lane bridge SH25 Kopu Bridge Replacement

580m long, two-lane bridge
  Hihitahi Bluffs Realignment - Realignment of 3.7km of SH.1 between Waiourou and Taihape Hihitahi Bluffs Realignment

Realignment of 3.7km of SH.1 between Waiourou and Taihape
  Hewletts Road Flyover - 2 ICm long flyover bypassing two intersections and a railway line Hewletts Road Flyover

2 ICm long flyover bypassing two intersections and a railway line
  East Tamaki Connection - Bridges - Construction of 2 bridges and widening of 2 existing bridges East Tamaki Connection - Bridges

Construction of 2 bridges and widening of 2 existing bridges
  Awatere Bridge and Approaches - Bridge Construction over the Awatere River Awatere Bridge and Approaches

Bridge Construction over the Awatere River
  Rapahoe Bridge Replacement - Construction of a 280m rail bridge over the Grey River Rapahoe Bridge Replacement

Construction of a 280m rail bridge over the Grey River
  Bridge 28 Hokitika Line (Arahura Bridge) - Bridge construction Bridge 28 Hokitika Line (Arahura Bridge)

Bridge construction
  Matata Rail Underpass Realignment - Construction of a 2 lane, 40m post tensioned bridge Matata Rail Underpass Realignment

Construction of a 2 lane, 40m post tensioned bridge
  Whau Creek Bridge - Dart 5 - 2 new concrete bridges Whau Creek Bridge - Dart 5

2 new concrete bridges
  Bridge 59 - Te Puna, Bay of Plenty - Bridge replacement Bridge 59 - Te Puna, Bay of Plenty

Bridge replacement
  HEB Construction - civil contracting, roading and bridge construction, subdivisions, landscaping, infrastructure maintenance, drainage, precast and prestressed concrete, wharves and marinas, piling and foundations
  ©Copyright - HEB Construction Ltd     Contact Us
Company Awards